HNL TAXIWAY(TWY) C RESTRICTIONS DURING SHOULDER CONSTRUCTION PHASES 6A & 6B
TWY C Aircraft Wingspan Restrictions, 16 March – 16 April, 2025; TWY C between TWY F and TWY RT is restricted to a 52’ wingspan; aircraft with wingspans exceeding 52’ must use alternate routes.
TWY RT Closure: March 15, 2025 – March 28, 2025: TWY RT will be closed between TWY C and TWY R with no access to TWY RT in this segment during the closure period.
TWY C Shoulder Work (Between TWY RT and F), March 15, 2025 - April 16, 2025: Shoulder rehabilitation work will be done on TWY C, extending through TWY F. NOTE: Either the North or South entrance to the Tie-down/T-hangar area will remain open. Exercise caution in this area due to ongoing construction activity.
POC: Thomas Waldman: email: [email protected]; phone: (808) 836-6661